October 23, 2026 · Nick Maff

Value-Add Renovations: Insuring Apartment Units While the Work Is Underway

You are renovating units as they turn. Cabinets, flooring, fixtures, sometimes plumbing and electrical. The building is still occupied, the rents are still coming in, and a contractor is working in the unit next to a resident.

That is where coverage questions tend to appear, and they are better answered before the first crew shows up than after a fire or a water loss.

Why a renovation changes the risk

A value-add program does not just add cost. It changes what underwriters see.

  • Vacant units. Units sit empty between move-out and move-in while work happens. Many property policies treat vacancy differently, and the rules can be strict.
  • Contractors on site. Hot work, demolition and new plumbing connections create exposures that a stabilized building does not have.
  • Higher values. New finishes raise the cost to rebuild. If your values do not move, you may be underinsured on the units you just upgraded.
  • Water and fire during the work. Open walls, shutoff valves and temporary power are common sources of loss in a renovation.

None of this makes the program uninsurable. It means the policy should be read against what you are actually doing.

Builder’s risk or your property policy

The first question is which policy responds to a loss on the renovation itself.

Your existing property policy may cover the building while work is underway, but many policies place limits or conditions on renovation and construction. Some exclude or restrict coverage for work in progress, or require that you notify the carrier above a certain project size.

A separate builder’s risk policy is designed for projects under construction. Whether you need one depends on the size and scope of the work, what your property policy says and what your lender requires.

For a unit-by-unit program on an occupied building, the answer is often not obvious. It is worth asking your broker to read the renovation language in your property form and tell you in writing how a loss would be handled.

Vacancy conditions

This is the clause that catches owners most often.

Property policies commonly say that coverage for certain perils, such as vandalism or water damage, is reduced or removed once a building has been vacant for a set period. The definitions of “vacant” and “unoccupied” vary by form, and so does the treatment of units versus whole buildings.

If you are holding several units empty at once during a renovation, ask:

  • How does the policy define vacancy, for a unit and for a building?
  • Does a unit under renovation count as vacant?
  • Which perils are limited, and after how many days?
  • Is there an endorsement that adjusts these rules for a renovation program?

The clause reads literally, and the time to learn what it says is before a loss. Water damage is the loss that tends to follow vacant units, and I wrote about it in Water Damage in Apartments.

Contractor insurance and contracts

Your own policy is only one layer. The contractor’s insurance and your contract with them decide how much of a loss lands on you.

At a minimum, tie these to every renovation contract:

  • General liability limits that fit the work, with you named as an additional insured
  • Workers’ compensation for the contractor’s crew
  • Waiver of subrogation where appropriate, so the insurers are not pushed into fighting each other
  • Certificates collected before work starts, with expiration dates tracked
  • Indemnity language reviewed by your attorney

Subcontractors matter too. If the general contractor hires an electrician or plumber, ask whether they carry their own coverage and how it is verified.

I wrote more on this in Insurance Due Diligence When Buying a Portfolio, which also touches on what to confirm about the work already underway at a property you buy.

Contract and indemnity wording is a legal question. Your attorney should review it, not your broker.

Loss of rents during the work

Rental income is part of the value-add story, and it can be part of the coverage too.

Many property policies include some form of rental income or business income coverage that pays when a covered loss makes units unusable. A few points to check:

  • Does it cover rents you would have collected on units that were vacant for renovation, or only units that were occupied?
  • Is there a waiting period before it starts?
  • How long does it last, and is there an extended period for lease-up after repairs?
  • Is the limit based on realistic projected rents, including the increase your renovation is meant to produce?

If your pro forma assumes higher post-renovation rents, the coverage should be set with that in mind. Otherwise a loss during the program can leave a gap between the income you planned for and the income the policy recognizes.

Update values as the work is done

A renovated unit costs more to rebuild than it did before.

Keep your statement of values moving with the program. Report completed units and total spend, and ask your broker how and when to submit updates. Some policies have conditions tied to values reported at inception, and a value that lags can show up in a claim as a shortfall.

The goal is simple. What you report should match what it would cost to rebuild what is actually there.

What to ask your broker before the work starts

Raise this early, ideally before you commit to a renovation schedule.

  • Does my property policy limit or exclude coverage during renovation, and at what project size?
  • Do I need builder’s risk, or can the current policy be endorsed?
  • How does the policy define vacancy for units under renovation, and what is limited?
  • What does my rental income coverage include for units held off line?
  • What contractor insurance requirements should go into every contract?
  • When and how should I report completed renovations and updated values?
  • Does my lender have requirements for insurance on renovation work?

Ask for the answers in writing so the whole team works from the same understanding.

Plan the insurance with the budget

Treat the insurance review as part of the renovation plan, not an afterthought. The cost of asking is small compared with finding out about a vacancy clause after a loss.

My team has insured more than 2.5 million multifamily units across all 50 states, and value-add programs come up often. You can see more on the multifamily page.

If you have a renovation program planned or already underway, I am happy to talk it through.

Get a second look at your program.

Tell me about your portfolio. I'll tell you honestly whether there's a better structure, a better price, or neither.

Start the conversation